Construction Week 25:
- C & S installed all of the fire/alarm boxes and pulled the wire to each device.
- Frontier Fire unloaded their next batch of pixie and fittings and are beginning to install the system in the SOS classroom wing.
- Jacob was the spotter for K & F Excavating on the light pole bases in the parking lots and the trenches for all of the associated conduits.
- The other crew is sheeting the radius wall on the front of the sanctuary.
- Windows were installed in the SOS wing and the Sanctuary.
Here is a short video clip that highlights some of this week's work. It's called: Finish Line!
Construction Schedule for the Next 4 Weeks:
- Go to "Got Questions? We've got answers." on the right hand side of this page.
- Click on "Look Ahead - Next 4 weeks - 7/29-8/22".