Week 31:

  • Excavators were able to remove the pine tree that was in conflict with the storm sewer operation.
  • Fire/sprinkler fitters are continuing to build the fire system for the sanctuary.
  • Roofers are stocking the roofs with all of the shingles and misc. materials
  • Subcontractor continues to work on filling the parking lot islands and grading the parking lots.
  • Mechanical crew is building the ductwork in the Fellowship Hall and the Sanctuary.
  • Electricians are pulling lighting circuits to all of the light fixture locations.

Monday, September 9, 2019

"Walk Through" of the Construction Site

Dear Friends:

The Building Committee has arranged with the contractors to allow for a "Walk Through" of the Fellowship:
  • Sunday
  • September 22nd
  • Anytime between 9:30 am & 11:30 am
  • Park on Caria or Ceres
  • Enter, on foot, at the North  Caria entrance
  • Guides will be available to direct you through the construction site.
  • Please wear solid shoes, no sandals, since this is a construction site.