Week 25 - Finish Line!


Construction Week 25:

  • C & S installed all of the fire/alarm boxes and pulled the wire to each device.
  • Frontier Fire unloaded their next batch of pixie and fittings and are beginning to install the system in the SOS classroom wing.
  • Jacob was the spotter for K & F Excavating on the light pole bases in the parking lots and the trenches for all of the associated conduits.
  • The other crew is sheeting the radius wall on the front of the sanctuary.
  • Windows were installed in the SOS wing and the Sanctuary.

Here is a short video clip that highlights some of this week's work.  It's called:  Finish Line!


Construction Schedule for the Next 4 Weeks: